Preparing for Heavy Machinery Transport: A Checklist for Machine Owners

Heavy machinery moves most often fall through at the preparation stage. We've pulled together the information we need, which low-loader suits your machine, what to check at the loading site, and how to get the machine ready to go.

A heavy machine move rarely goes wrong on the road – far more often it goes wrong in the preparation. Missing details, a machine that turns out taller than expected, a site the vehicle can't reach. In this checklist we've gathered everything the machine owner or shipper should review in advance, so the machine leaves on the planned day without a hitch.

Contents

  1. What information will we need?
  2. Which low-loader suits your machine?
  3. The loading and unloading sites
  4. Preparing the machine before departure
  5. Loading and securing
  6. Documents, liability, insurance
  7. What determines the price?
  8. The checklist in one place

What information will we need?

For an accurate quote and for the permits, we need the machine's details in its transport configuration – not necessarily the figures in the brochure.

  • Make and model – often this alone tells us which low-loader is needed.
  • Length, width and height in transport configuration: boom lowered, bucket in, mirrors folded, steps raised.
  • Weight including attachments: counterweight, bucket, adapter, fuel.
  • Is the machine self-propelled, and will it be in working order at the time of loading?
  • Lashing points – whether there are any and where they are.
  • Exact loading and delivery addresses, the preferred date, and the phone number of an on-site contact.
  • 1–2 photos of the machine – a great help in choosing the trailer and planning the securing.

You can send all of this in one go using our quote request form, photos included.

Which low-loader suits your machine?

  • Ramp trailer (beavertail low-loader): for self-propelled machines (tractors, loaders, excavators) that drive on under their own power.
  • Low-bed (well) trailer: for tall machines (lifts, larger plant), because the low deck keeps the overall height of the combination down.
  • Flatbed (mega) trailer: for long, bulky loads, steel structures and formwork.

You'll find the exact loading dimensions of our low-loaders on our oversized transport page, where a quick checker also shows which one your machine is likely to fit on.

The loading and unloading sites

A low-loader combination can be 18–20 m long and needs a wide turning circle. It pays to think ahead:

  • Will the combination fit through the entrance and gate, and along the roads within the site?
  • Is the ground firm and level enough for loading? In wet weather, an unsurfaced area can become unusable.
  • Are there any low cables, overhanging branches or access restrictions (a weight-restricted bridge, a built-up area)?
  • Is a crane or forklift needed for a non-self-propelled load, and who will provide it?
  • Will there be a machine operator on site to drive the machine on and off?

Preparing the machine before departure

  • Boom, bucket and attachments should be in the transport position, with moving parts secured.
  • Loose parts and tools should be removed or secured – they can fall off on the road.
  • Doors, windows and service covers closed; hand over the key as agreed.
  • Check for any oil or fuel leaks.
  • The machine should be clean – mud and soil can drop onto the road and can hide the lashing points.
  • If the machine has any existing damage, photograph it before handover.

Loading and securing

Self-propelled machines drive up a ramp or the ramps of the low-bed trailer; non-self-propelled loads are lifted onto the deck by crane or forklift at the shipper's site. Proper load securing (chains, tensioners, anti-slip mats) is the haulier's responsibility – and knowing the lashing points and the centre of gravity is especially important here. That's why it helps if the machine operator is also present during loading.

Documents, liability, insurance

  • On international journeys the consignment travels with a CMR consignment note, which records the condition of the load at collection and at delivery.
  • Keep the machine's paperwork to hand (invoice, delivery note and, for destinations outside the EU, customs documents if required).
  • Under the CMR Convention, the haulier's liability on international journeys is limited to an amount based on the weight of the load, which for a high-value machine can be far less than the machine is worth. For a high-value machine it's worth taking out separate goods-in-transit insurance – we can help with this, too.

What determines the price?

The key factors are the distance, the machine's size and weight, the type of low-loader required, permits and escort, and any crane loading or storage. For short-distance machine moves, a minimum or call-out charge is common. You'll find indicative prices and details of our charges in the FAQ, and we've written in detail about the permit rules here: Oversized loads: permits, escorts and lead times.

The checklist in one place

  1. Make, model, 1–2 photos
  2. Dimensions in transport configuration (length, width, height)
  3. Actual weight including attachments
  4. Self-propelled? In working order? Will an operator be present?
  5. Loading and delivery addresses, date, on-site contact
  6. Entrance, ground conditions and obstacles on site
  7. Crane / forklift needed? Who provides it?
  8. Machine in transport position, loose parts secured, no leaks
  9. Existing damage photographed
  10. Documents and, if needed, goods-in-transit insurance

Once you've got these covered, most of the job is already done – we take care of the rest, from choosing the low-loader to permits and escort. Request a quote for heavy machinery transport »